
Package Contents
Quoizel, Inc.
6 Corporate Parkway
Goose Creek, SC 29445
Customer Service
Phone 631.273.2700
Fax 631.231.7102
www.quoizel.com
ToolsRequired:Flathead screwdriver,Phillips screwdriver,pliers, wirecutters, wirestrippers, electricaltape,
safetyglasses.
BulbRecommended:
EstimatedAssemblyTime:
Preparation:
(4)Medium Base100W bulbsMaximum,Alternatebulb(4) 23WCFLMaximum.
20-30minutes
Identifyand inspectall partsbefore beginninginstallation. Checkpackage contentlist anddiagrams
belowto besure allparts arepresent. Ifany partsare missingor damaged,do notattempt toassemble, install,or
operatethe fixture.Contact customerservice forreplacement parts.
Warnings and Cautions
1of3
Assembly Instruction Sheet #IS-KY433IB
For Style KY433IB
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2014 QuoizelInc.
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
Hardware Contents
AA
EE
Crossbar
x1
Mounting Ball
x1
B
Fixture Body
x1
BB
CC
DD
Lock Washer
x1
Hex Nut
x3
Nipple
x1
A
Shade
x4
GG
Fixture Chain
x2
FF
Quick Link
x4
STEP 1 Install Fixture Chains-
*
A. Adjust the Fixture Chain (GG) to your
desired length by removing the links
if needed.
Pliers is required for this step.
B. With the Fixture Chain (GG) not
attached to the fixture loop and the
Canopy Chain Loop, pull the supply
wires with ground wire through the
Fixture Chain (GG) alternating links.
After the wires are through the Fixture
Chain (GG), pull the Supply Wires
and Ground Wire through the Ceiling
Canopy (HH).
C. Attach one ends of the Fixture Chains
(GG) to the fixture loop on the top end
of the Fixture Body (B) with two Quick
FF
GG
HH
B
Ceiling Loop
Supply Wires
and Ground
Wire
HH
Ceiling Canopy
x1
FF
Figure 1
Links (FF) as shown. Lift the fixture and Fixture Chains (GG) up and
attach the other ends of the Fixture Chains (GG) onto the Canopy
Chain Loop underside of the Ceiling Canopy (HH) with the rest two
Quick Links (FF).
Suggested rods and chain length for Ceiling height :
8’ ceiling : use (9) links of chain and 2 quick links
9’ ceiling : use (19) links of chain and 2 quick links
10’ ceiling : use (29) links of chain and 2 quick links
STEP 2 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
Outlet Box
Outlet Box Screw
(not included)
AA
Green Ground Screw
Figure 2
STEP 3 Install Nipple to Crossbar-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to the
middle of the Nipple (DD). Place
the Lock Washer (BB) over the
Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA)
until the Nipple (DD) is about
0.375” above the Crossbar (AA).
B. Remove the Ceiling Canopy (HH)
and then tighten the Hex Nut (CC)
against the Crossbar (AA) to
secure in place.
C. Thread another Hex Nut (CC) onto
the end of the Nipple (DD). Thread
this Hex Nut (CC) on just enough
so the inside surface of the Ceiling
Canopy (HH) rests against it. * You
may have to trial fit the Ceiling
Canopy (HH) one more times to
insure this distance also. This Hex
Nut (CC) is needed here to prevent
you from crushing down the center
of the Ceiling Canopy (HH).
AA
BB
CC
DD
Step A
Figure 3
CC
August2014
Kommentare zu diesen Handbüchern